Get help now Watch Apply
SearchApply or register interestContactGet help now
Accounts open soon. For now, your progress saves on this device only, and nothing is sent to us.Your record

VP Day One

  • Lesson4 of 6
  • Time25 min

How a VP day runs

For teachers

Outcome

Describe a volume shoot from prep to wrap: world sign-off, load-in, tech check, shoot and wrap.

Mapped to 1 ScreenSkills checklist line
  • ScreenSkills virtual production competencies: camera roles · Setting up camera and related equipment for virtual production: "carry out sync and gen lock tests, calibrate tracking and ensure 3D tracking is functioning"

ScreenSkills checklists are guides, not accreditation. This course is not endorsed by ScreenSkills.

Watch

2 films · about 11 minutes

0% watched

Films are made and owned by the channels named, and play from YouTube. Inclusion here is not an endorsement either way.

Before the day

  • Worlds are built and signed off in prep. Changing a world on the day is slow and costly, so the director, DoP and designer review them in advance, often in VR or on the wall at a tech scout.
  • The schedule groups scenes by world, because loading and lighting a new world takes time.

On the day

  • Pre-call: the stage crew powers up the wall and processors; the brain bar loads the day's worlds; tracking is calibrated.
  • Tech check: genlock, tracking, colour and the first set-up are tested with camera before the cast arrives.
  • Shoot: the AD runs the floor as normal. World changes are called like any other reset, and the AD knows how long they take.
  • Every change is logged against the slate, so post knows which world version was on the wall.

At wrap

  • Worlds and logs are saved and handed over. Power-down follows the stage's procedure.
  • Footage goes to the DIT as on any shoot. What was finished in camera, and what goes to VFX, is noted.

Check

3 questions drawn from 8 · pass mark 80% · safety-critical questions must be right · 3 attempts in 24 hours · new questions each time

Watch the films to open the check.

Do

Put the day in order · 10 minutes

Put these eight steps of a volume day in order.

A Tech check with camera. B Worlds signed off by director, DoP and designer. C Wall powered up and worlds loaded. D Cast arrive, rehearse, shoot. E World change for scene 12, called by the AD. F Logs and worlds saved and handed over. G Footage to the DIT. H Tracking calibrated.

How it's marked
  • B first (in prep)
  • C and H before A
  • D after A
  • E during the shoot
  • F and G at wrap

Met or Not yet, with a comment from a trained reviewer. Until accounts open, open the model answer after you submit and mark your own work against it.

Model answer (open after you submit)

B, C, H, A, D, E, G, F (G and F can swap).

Reflect

Record

This is everything kept about this lesson. In the pilot it's held by Futures in Film CIC in your account; Screen Sisters CIC sees named records only if you agree. Your data

Moving on doesn't complete a lesson. A lesson is complete when the films are watched, the check is passed and the task is marked Met.