Get help now Watch Apply
SearchApply or register interestContactGet help now
Crew rig a Panavision film camera on a scaffold platform on a set.

Learn · Shooting on film · Budget and schedule

A 1,000 ft roll of 4-perf 35mm runs about 11 minutes.

At 24 frames a second, that arithmetic is what the whole schedule sits on.

This page gives the shape of a film budget, not prices. Prices move, and Kodak and the labs quote per job.

Which lines does a digital shoot never have?

Line What to know
Stock Bought by the foot, up front, and not reduced by working faster. Short ends and recans are real inventory; a good clapper loader saves money with them.
Processing Charged by the foot on everything exposed. A slipping ratio shows here first.
Scanning Priced by resolution and volume. Process everything, scan selectively, and decide the policy in prep.
Clapper loader A position digital does not have, and not one to economise on. See the load.
Transport and turnaround Negative goes to the lab daily and securely. Distance is a budget line and a schedule constraint.

The numbers (checked November 2026)

What Figure Source
35mm 4-perf at 24 fps 90 ft a minute; 1,000 ft about 11.1 min; 400 ft about 4.4 min Arithmetic: 16 frames a foot
35mm 3-perf at 24 fps 67.5 ft a minute; 1,000 ft about 14.8 min Arithmetic: about 21.3 frames a foot
16mm at 24 fps 36 ft a minute; 400 ft about 11.1 min Arithmetic: 40 frames a foot
Same-day processing at Kodak Film Lab London Negative delivered before 10am, Monday to Friday Kodak
Weekend and out-of-hours processing By appointment, at extra charge Kodak
A technician preps a camera package on a cart in an equipment store lined with cases.
Prepping a camera package in the kit store. On film, the mags and the loading bay are budget lines.

What does film do to the schedule?

  • Prep grows, shoot shrinks. Camera, lens, stock and lab tests, plus a day watching them. Cutting prep to protect shoot days usually costs more shoot days later.
  • Rehearsal is a line item. It controls the stock line, so schedule it, with cast availability.
  • The day has hard stops. Magazine changes set the rhythm, and the lab's morning cut-off decides when negative leaves set.

What actually goes wrong?

Not a lost roll. A ratio running quietly over, week by week, until the stock and processing lines are gone. Hold contingency against the ratio and review it weekly against the camera reports.

Last reviewed 9 November 2026